Floor Plans



Cross Section


Specifications


FLOOR
  • Leaseable Space: Cement Render
  • Main Entrance Lobby / Lift Lobby: Quality Natural Stone
  • Typical Lift Lobby: Quality Natural Stone
  • Common Toilet: Homogenous Porcelain Tiles
WALL
  • Leasable Space: Autoclaved Aerated Block For Wall Next To Common Areas; Dry Wall Partitioning For Dividing Walls Between Tenants
  • Main Entrance Lobby / Lift Lobby: Quality Natural Stone
  • Typical Lift Lobby: Quality Natural Stone
  • Common Toilet: Homogenous Porcelain Tiles / Natural Stone
CEILING
  • Leasable Space: Mineral Fibre Ceiling; Perimeter In Plasterboard Finish With Concealed Return Air Slot
  • Typical Lift Lobby: Plasterboard Ceiling
  • Common Toilet: Plasterboard Ceiling
M&E
  • Telephone: Underfloor Trunking C/W Structured Cabling And Fibre Backbone Provided
  • SMATV: Provided
  • Lifts Capacity: 24 Persons For Passenger Lift (Tower Building). 15 Persons For Car Park Lift (Car Park Annex)
  • Security Access: Card Access Readers and Pedestrian Barriers are Provided
  • Electric Supply: Dedicated Power Supply & Distribution Board
  • Remote CCTV Monitoring: Lift Lobby / Basement Car Park
  • Stand By Generator: 2 Units
TELECOMMUNICATION & INFORMATION TECHNOLOGY
  • Fibre Optic Backbone - Single mode
LIGHTING
  • T5 Lighting Provided In Office Area
ACMV
  • Centralised VAV System
  • Centralised Air-cooled Liquid Chiller installed at the roof top
FIRE FIGHTING
  • Fire Sprinkler System as required by Bomba
FLOOR TO CEILING HEIGHT
  • 2.9 metres (9.5 feet)
FLOOR LOAD CAPACITY (LIVE LOAD)
  • Live Load (Offices for General Use) - 2.5 kN/sq.ft.
  • Dead Load (Lightweighted Partition for Open Office area) - 1.0 kN/sq.ft.
Buy now